P-89 Drawbridge???
9 Replies, 8748 Views
The 2 track pieces are packaged on top of the bridge and they connect to the ends
(This post was last modified: 04-08-2019, 02:53 PM by Super.)
Ahh, now that makes sense, thank you Rekp. Sp I assume that the Drawbridge part acts like any other drawbridge then.
I think the two bits in the middle connect to the middle of the bridge on each side not the ends. If you look closely the bits sitting on the bridge have one flay end which means it needs to finish somewhere.
So this would be the same as the road crossing drawbridge you pictures except its a train crossing drawbridge...interesting. Thanks AOF!
WARNING...Danger ahead...Collision, Collision! LOL Thanks for the close ups Dr Chris.
|
Users browsing this thread: 1 Guest(s)