(05-26-2014, 01:04 PM)ActionChugger Wrote: Evan will be three soon. Time flies!
I'm running out of ideas on how to top off the new tracks.
I don't want to take down the other track (left corner with green bridge) and move it onto the new layout
And hey! I still have my real teeth! thank you!
Why not 2 seperate spirals that go up, and connect within a bridge leading out from one side in both of them? Then at the bottem of both spirals, put a track connecting the 2, so a train will go up one spiral, cross a bridge to the second one,and go down the second one. Then the train will cross the bottem track and do it all again. That may work if you need some ideas
From Thomas To Today's Modern Diesels, They're All A Part Of My Rail-Yard!
(This post was last modified: 05-26-2014, 01:59 PM by Trackmaster-Rail-Yard.)