Super asked me a while back if I planned to do a Plarail Christmas layout this year. Yeah, I had PLANNED to do one but other stuff got in the way, so my son Wes stepped in this year and set it up! I’ve had some trouble getting it all photographed but I’ll try and add more pics as lighting and time allow.
This year, Wes decided to run his TM1 Henry with a rake of my red SuHa coaches. On the inside loop, there’s my EF81 with a single coach running the local service. The track is all TM1 and there’s a small bridge on the outside loop that crosses a body of water made from a section “water track” (not sure what to call it) from the TM2 Thomas ferry boat set that came out a couple or so years ago. The buildings are about 3-4 years worth of plastic Dollar Tree Cobblestone Corner stuff. The snow is all poly batting with polyfill hills in the back. He tried using some lamp posts that really light but it was difficult to route the wires and hide the battery box. They also kept falling over.
Aside from moving some things around for the photos, I had nothing to do with the set up of the layout this year.
This year, Wes decided to run his TM1 Henry with a rake of my red SuHa coaches. On the inside loop, there’s my EF81 with a single coach running the local service. The track is all TM1 and there’s a small bridge on the outside loop that crosses a body of water made from a section “water track” (not sure what to call it) from the TM2 Thomas ferry boat set that came out a couple or so years ago. The buildings are about 3-4 years worth of plastic Dollar Tree Cobblestone Corner stuff. The snow is all poly batting with polyfill hills in the back. He tried using some lamp posts that really light but it was difficult to route the wires and hide the battery box. They also kept falling over.
Aside from moving some things around for the photos, I had nothing to do with the set up of the layout this year.