Ouch...wonder how much each one cost to build and how much in total the loss is?
Flooded Shinkansen
16 Replies, 16984 Views
(11-07-2019, 04:44 PM)Trainfanz Wrote: .... Wonder how they will do that with 8 trains out of it.TakaraTomy Mall? (11-07-2019, 06:04 PM)Super Wrote: Ouch...wonder how much each one cost to build and how much in total the loss is? "About 135 million dollars"
Is that 135 million for each train?
keep in mind the trains are sophisticated and very small quantity are built.
My Trackmaster/Tomy/Plarail Photo Gallery Page (over 600+ photos and still under construction)
https://www.flickr.com/photos/183311600@N03/
The 8 JR East sets will be replaced.
-plarnold
in the long run, it may be feasible to build an indoor storage facility.
My Trackmaster/Tomy/Plarail Photo Gallery Page (over 600+ photos and still under construction)
https://www.flickr.com/photos/183311600@N03/ |
Users browsing this thread: 3 Guest(s)