Small update.
I got all of the MDF for the main level cut to size. It is not secured down yet only laid in place to test the fit. You may be wondering why there is such and overhang on the two 3ft box areas. Well my plan is to make a radius on each of them to give more of a chance to have a nice outer loop or two. I need to still cut those and then need to add a few more supports to fasten the MDF down to, but after that I should be ready to start with some track.
I think I will be fastening the frame to the wall as well at least in a couple spots as it still has some movement in it. Also eventually I may do some sort of scenery for the base like a grass or gravel look but for now it will likely stay the unfinished MDF, or possibly a primer coat of paint. My first layout may end up being a Christmas one due to the timing.
Also (last pic) I added some more supports just to make sure there should not being any sag, etc...
I got all of the MDF for the main level cut to size. It is not secured down yet only laid in place to test the fit. You may be wondering why there is such and overhang on the two 3ft box areas. Well my plan is to make a radius on each of them to give more of a chance to have a nice outer loop or two. I need to still cut those and then need to add a few more supports to fasten the MDF down to, but after that I should be ready to start with some track.
I think I will be fastening the frame to the wall as well at least in a couple spots as it still has some movement in it. Also eventually I may do some sort of scenery for the base like a grass or gravel look but for now it will likely stay the unfinished MDF, or possibly a primer coat of paint. My first layout may end up being a Christmas one due to the timing.
Also (last pic) I added some more supports just to make sure there should not being any sag, etc...